CBK (Caliraya, Botocan, Kalayaan)
Luzon Island - Philippines |
The project implies the doubling
of the existing hydroelectric plant of Kalayaan with the execution
of a new plant with two turbines of 175 MW each, positionned at -
40.5 metters below the sea level; rehabilitation of an existing dam
generating the Caliraya lake, with the length of 480 m; rehabilitation
of the connecting tunnel between Lumot and Calirayalakes (total length
of 1800 m); rehabilitation of Botocan concrete dam new intake (1,2
km of tunnel). |
 |
 |
 |
 |
|